Jun. 25th, 2017

galgal: (Default)
Specification of the buildings of the temple complex of the Third Temple


House for kohanim, type A (2 pieces)
1st floor: 18 changing rooms (with showers) for kohanim; 4 toilets
2nd floor: 18 changing rooms (with showers) for kohanim; 2 toilets
3rd floor: room for the singers of the Levitic choir; 2 toilets
2 washbasins near the front entrance
1 main staircase and 2 side staircases

Read more... )

Profile

galgal: (Default)
GalGal

September 2017

S M T W T F S
      12
34 5 678 9
1011 12 13141516
1718192021 22 23
24 25 2627282930

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Sep. 26th, 2017 12:55 pm
Powered by Dreamwidth Studios