Jun. 25th, 2017

galgal: (Default)
Specification of the buildings of the temple complex of the Third Temple


House for kohanim, type A (2 pieces)
1st floor: 18 changing rooms (with showers) for kohanim; 4 toilets
2nd floor: 18 changing rooms (with showers) for kohanim; 2 toilets
3rd floor: room for the singers of the Levitic choir; 2 toilets
2 washbasins near the front entrance
1 main staircase and 2 side staircases

Read more... )

Profile

galgal: (Default)
GalGal

July 2017

S M T W T F S
      1
2345678
91011 12131415
16 17181920 2122
23242526272829
3031     

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Jul. 28th, 2017 12:49 pm
Powered by Dreamwidth Studios